Cotton and cotton-elastane pretreatment preparation
Pretreatment Pre-check and Start-up List
Excel control system verifying fabric, machine, water, recipe and chemical preparation before pretreatment.
XLSX4 worksheets200-record capacityAutomatic start decision
Content tags
PretreatmentWater qualityMachine controlChemical preparationStart approval
- Version
- R02
- File size
- 29 KB
- File language
- Turkish
HT jet dyeing preparation
Dyeing Start-up Checklist
Excel checklist verifying recipe, machine, liquor, water, dyes, chemicals and dosing before dyeing.
XLSX4 worksheets40 control itemsAutomatic start decision
Content tags
HT jetDyeingRecipeDosingMachineWater quality
- Version
- R02
- File size
- 31 KB
- File language
- Turkish
Post-dyeing quality verification
Washing and Final Control Checklist
Verifies washing route, neutralization, rinsing, final pH, shade, fastness, width, GSM and shrinkage.
XLSX4 worksheets34 control fieldsAutomatic final decision
Content tags
WashingFinal pHFastnessSample approvalRelease
- Version
- R01
- File size
- 31 KB
- File language
- Turkish
Laboratory, instrument and analysis management
Weekly Laboratory Checklist
Manages instruments, calibration, solutions, water analysis, samples, safety and actions weekly.
XLSX5 worksheets200 analysis recordsCalibration warning system
Content tags
LaboratoryCalibrationSolutionWater analysisSampleSafety
- Version
- R01
- File size
- 54 KB
- File language
- Turkish
USE AND TECHNICAL-APPROVAL NOTE
Control limits must be defined for actual plant conditions
Water hardness, pH, conductivity, temperature, time, absorbency, whiteness, fastness and other acceptance criteria must be defined and revision-controlled by the authorized technical team with reference to machine, fabric type, recipe, customer specification, quality plan and plant targets.